Champ Clark Bridge Repairs
Monday, April 22 through Thursday, April 25, 2013, MoDOT will be working on the Champ Clark Bridge over the Mississippi River at Louisiana, Missouri. Crews will be working from 7 a.m. to 4 p.m. Traffic will be reduced to one lane with flagmen controlling traffic through the work zone area.


